PTS – Edwinstowe DFG Project

April 11, 2017 11:46 am

Latest Disabled Facilities Grant Project

PTS are proud to have been awarded the contract to carry out our latest complete DFG Installation and building works.

This project includes building works to extend and install a complete separate new Wet room and WC facility.

Installation Works

Works to include building of new wall, additional windows, complete tiling of new bathroom, AKW Shower tray with Altro Safety flooring, safety hand rails, new electrical installation including shower, lighting, new power additions, extractor fans and complete new Consumer Unit, complete new separate disable WC installation including new radiators and decoration throughout.

Disabled Adaption Projects

If you are looking to add a new wet room or disabled bathroom adaption to your property, then feel free to contact us for a no obligation quote for your upgrade and adaption requirements.

: Tel 01623 370515 : Email – info@pts-ec.co.uk

Back