PTS Completed DFG Project – June 2017

June 7, 2017 11:05 am

Recently Completed DFG Wet room Project

PTS have recently completed this DFG conversion for a client requiring a specialist Wet room to meet their sons requirements.

Adaptions included making the room larger by taking down the existing bathroom wall, partially bricking up the back bedroom window and installing a new window and stud walling to achieve a greater room size.

Installed items included :

  • Additional new WC and alterations to stack
  • Complete wet room Altro Flooring
  • Complete Tiling
  • Adaptions to plumbing inc new WC, WHB, Mira ATL Flex Shower and new radiator
  • New Consumer Unit, Bathroom LED Lighting, Shower Circuit, Humidistat Extractor Fan
  • Complete Tiling, over boarding, plastering and decoration
  • Renewal of floor boards and repairs to existing rotten joists

Contact us anytime for a free no obligation quote for any of your Bathroom, Wet room or Building Project needs

Back