Waste Management Site Outage

Challenge

 

  • As Hydac’s Scottish Service Partner PTS were awarded in early 2022 the supply of all hydraulic spares and scopes of work relating to the outage for the hydraulic handling system for a Scottish waste Energy recovery facility. The central Scotland plant deals with annually 300,000 Tonnes of post-recycling ‘residual waste’ from landfill and contributes to Scotland’s energy security.


Solution

 

  • PTS Solutions supplied all materials, equipment and a team of personnel on a 24/7 basis during the late, 2022 Outage for a 3 week period. The PTS outage scope of work facilitated the main hydraulic systems servicing, fluid replacement and conditioning, parts replacement and upgrade of safety features for protection of personnel around the plant. A dedicated PTS Services project team acted as the single point of contact for our scope of work for the outage.


Outcomes

  • All materials sourced and stocked up to 6 months prior to Outage.
  • Full onsite workshop and stores capability with all equipment shipped to site for the outage.
  • Fully flexible 10 man squad working on a 24/7 basis around other contractors simultaneous operations on site.
  • All work carried out within critical timeline and with zero safety incidents.
  • Delivered on budget.