Marine HPU Delivery

Challenge

 

 

  • Design and Manufacture a Marine HPU for underdeck installation for the operation of a complete inbuilt umbilical deployment system within a very tight space window within lower decks of a new build pipelay vessel and to meet very exacting operational parameters for a global operational functionality.


Solution

 

 

  • PTS Services supplied full design, calculations, manufacture, assembly and factory testing for the HPU for the full structural and hydraulic scopes as a single source supplier working with our key suppliers to meet a tight timescale for supply.


Outcomes

 

  • Complete HPU design and layout to meet specific tie-in requirements within vessel compartment.
  • Air blast cooling and system filtration requirements for a global operational parameters supplied by Hydac.
  • Exacting reservoir design and construction, pump control considerations and control manifolds to meet large volume changes within system.
  • Extensive testing and operational simulation during FAT to meet strict parameters of operation.